domenica 30 dicembre 2012

Elm Bowl Day Two

Second day full immersion on elm bowl job..
finish inside bowl, waxed piece have show a couple of annoying line,
due too not so good turning...
and sanding as well...
to do a good job i believe i need a S Line ToolRest, 
that allowed me to get very close to the wood while working the inside of the bowl...  
Guide much better the 16 bowl gouge...

IT's pity becouse those line inside the bowl are really an eyesore...

however i'll wait some days before finish cutting the hold chuck...

The bowl is 16" diameter - 7 1/2 high

produced at least 4 hour of good domestic fire chippings...

                                               
                                                                      Thick 1 cm









                                                                           Details





Cheers

Nessun commento:

Posta un commento